Materials & processeswww.semi.org.cn

Langu New Energy Completes Nearly RMB 200 Million B+ Round; Six Funds Listed as Participants

According to semi.org.cn, published 9 November 2026, 蓝固新能源 (Langu New Energy, transliterated; no official English name given) has recently completed a nearly RMB 200 million B+ funding round. The report lists six participants in this sequence without designating a lead investor or disclosing ranking: 中化学新材料基金, 信建未来, 华成创投, 溧阳战新基金, 常州新能源产业基金, 南通创投. Proceeds are to be directed mainly into solid-state battery electrolyte materials R&D and industrialization. As stated in the outlet's report, with no independent verification cited, the Liyang base has a ten-thousand-tonne oxide solid-state electrolyte line in operation and a hundred-tonne all-solid-state line running steadily; the Zibo base's 50,000-tonne-per-year lithium- and sodium-battery electrolyte and in-situ solidification project keeps releasing capacity; and construction of a thousand-tonne all-solid-state electrolyte line has started at the Suining base.

Original publication: 2026-11-09
AI-generated illustration / AI 生成示意图

According to semi.org.cn, published on 9 November 2026, 蓝固新能源 (Langu New Energy, a transliteration; the source gives no official English name) has recently completed a nearly RMB 200 million B+ funding round.

The report lists the six participants in this sequence without designating a lead investor or disclosing ranking: 中化学新材料基金, 信建未来, 华成创投, 溧阳战新基金, 常州新能源产业基金 and 南通创投. Names appear in the source only in Chinese; no official English names are provided. The report states that the funds will be directed primarily into the R&D and industrialization of solid-state battery electrolyte materials, which it describes as helping the company further strengthen its technological and production capacity advantages — promotional claims carried in the report rather than independently verified statements.

Capacity updates as stated in the report (no independent verification cited)

  • Liyang base: the report states a ten-thousand-tonne oxide solid-state electrolyte production line has been built and put into operation, and that a hundred-tonne all-solid-state electrolyte line is running steadily.
  • Zibo base: the report states the project with annual capacity of 50,000 tonnes of lithium- and sodium-battery electrolyte and in-situ solidification electrolyte continues to release capacity.
  • Suining base: the report states construction of a thousand-tonne all-solid-state electrolyte production line has formally started.

All figures above come from the funding item published by that outlet; the report cites no independent verification or third-party source, and the references to technological and capacity advantages are promotional. It does not disclose post-money valuation, investor shareholding stakes or the timing of capital deployment.

Sources: 蓝固新能源完成近两亿元B+轮融资